|
|
|
|
|
|
|
|
Keel needs urgent attention |
|
The whole underwater body of the boat was sanded down to gelcoat/steel. 7 coats of epoxy was applied before 4 coats of antifouling. In between a lot of filler was applied to smoothen the keel shape. |
|
|
|
|
|
|
|
|
|
|
Colin ready to work on the boat |
|
|
|
|
|
|
|
|
|
|
|
|
Everything was taken out, and then put back inn again. |
|
|
|
|
|
|
|
|
|
|
|
|
Some of the trailerloads that went in. |
|
|
|
|
|
|
|
|
|
|
|
|
It's all coming together and starting to look like a home |
|
|
|
|
|
|
|
|
|
|
|
|
Coconut ready to leave Son in July 05 |
|
|
|
|
|
|
|
|